1. Due to a fault you are unable to clear TVC789. This is also holding TVC783 at danger. What must you do?
Select 1 answer
Instruct driver to pass both TVC783 and TVC789 during the same instruction
Instruct driver to pass TVC783 at danger and call you back at TVC789
Hold train on the Reversible Fast Spur until fault rectified
Speak with Control and suggest sending the train back towards Balham
Ref: 8
Question not yet verified
Question ID
Correct Count
2. What is the line speed on the Down Brighton Fast?
Select 1 answer
30mph over 60mph
30 mph over 70mph
40mph over 60mph
40mph over 70mph
Ref: 27
Question not yet verified
Question ID
Correct Count
3. What is the station length at Streatham Platform 1?
Select 1 answer
8 coaches 161.5m
9 coaches 187.4m
10 coaches 213.5m
12 coaches 252.3m
Ref: 16
Question not yet verified
Question ID
Correct Count
4. Who is the ECO?
Select 1 answer
Selhurst 0208 653 6297
Brighton 0127 382 0050
Raynes Park 0208 946 0771
Rugby 01788 555 422
Lewisham 0208 694 4400
Ref: 3
Question not yet verified
Question ID
Correct Count
5. Where in the WON are you required to check for this workstation?
Select 3 answers
SO500
SO510
SO650
SO680
SO700
Ref: 19
Question not yet verified
Question ID
Correct Count
6. What is the line speed on the Up/Down Streatham Spur?
Select 1 answer
15mph
20mph
30mph
30mph over 45mph
Ref: 26
Question not yet verified
Question ID
Correct Count
7. How many bridges on the workstation are classified as a red bridge?
Select 1 answer
0
1
2
3
4
5
Ref: 4
Question not yet verified
Question ID
Correct Count
8. Majority of signals are 4 aspect. Which signals are 3 aspect?
Select 4 answers
TVC779
TVC781
TVC651
TVC783
TVC821
TVC822
TVC823
TVC824
Ref: 2
Question not yet verified
Question ID
Correct Count
9. What line is Platform 2 Tooting on?
Select 1 answer
Down Brighton Fast
Down Brighton Slow
Up Brighton Fast
Up Brighton Slow
Down St Helier
Up St Helier
Ref: 34
Question not yet verified
Question ID
Correct Count
10. TVC657 is a one shot signal that does have TORR. This means..
Select 1 answer
The signal must be cancelled before reusing.
The signal can be cleared immediately.
Ref: 22
Question not yet verified
Question ID
Correct Count
11. If a driver is required to use the wildcard number to set up their GSM-R, what is the wildcard number on Streatham workstation?
Select 1 answer
990
991
992
993
995
999
Ref: 6
Question not yet verified
Question ID
Correct Count
12. At TVC789, a train with a headcode beginning 9V will usually be signalled:
Select 1 answer
To Wimbledon
To Mitcham Eastfields
Ref: 23
Question not yet verified
Question ID
Correct Count
13. As soon as section LB is occupied, how long must you wait until you can swing TVC331 points?
Select 1 answer
45 seconds
52 seconds
60 seconds
75 seconds
Ref: 21
Question not yet verified
Question ID
Correct Count
14. Which signals are one shot signals with no TORR?
Select 4 answers
TVC675
TVC673
TVC674
TVC676
TVC666
TVC659
TVC788
Ref: 13
Question not yet verified
Question ID
Correct Count
15. What is the signal prefix for the workstation?
Select 1 answer
TL
VC
TVC
TVS
Ref: 18
Question not yet verified
Question ID
Correct Count
16. What line is Platform 1 Streatham on?
Select 1 answer
Down Brighton Fast
Down Brighton Slow
Up Brighton Fast
Up Portsmouth
Down Portsmouth
Up St Helier
Ref: 35
Question not yet verified
Question ID
Correct Count
17. What line is Platform 4 Streatham Common on?
Select 1 answer
Down Brighton Fast
Up Brighton Fast
Down Brighton Slow
Up Brighton Slow
Down St Helier
Up St Helier
Ref: 33
Question not yet verified
Question ID
Correct Count
18. Due to a gapping issue what must you do when setting the route from TVC783 to TVC789?
Select 1 answer
Make sure the train has come to a stand at TVC873 and you have spoken to the driver to inform them not to stop at TVC789.
Stop trains at TVC789 and ensure they still have power.
Set the route from TVC789 so TVC783 will show a proceed aspect
Ref: 7
Question not yet verified
Question ID
Correct Count
19. What junction can a routing conflict occur?
Select 1 answer
Streatham Junction
Streatham Common Junction
Streatham North Junction
Streatham South Junction
Ref: 15
Question not yet verified
Question ID
Correct Count
20. What is the email address for the workstation?
Select 1 answer
streatham.workstation@networkrail.co.uk
streathamworkstation@networkrail.co.uk
streatham@networkrail.co.uk
tbrocstreatham@networkrail.co.uk
Ref: 5
Question not yet verified
Submit